SPIN PLAN OF SPINNING LINE
A. Auto Cone:
Delivery speed (mtr/min) x 1.0936 x 60 x 24 x no.spindles x eff.%
Production = ----------------------------------------------
840 x count x 100
1000 x 1.0936 x 60 x 24 x 60 x 0.72
Production = ---------------------------------------------
840 x 40 x 100
Where,
Delivery speed = 1000,
No. of spindle = 60,
Production = 24.30 bags/day/auto cone
No of auto cones require = ring production/production of one auto cone
No of auto cones require = 265/24.30 = 10
B. Ring:
Avg. Spindle speed x 60 x No.of Spindles x 24 x Eff.%
Production = -----------------------------------------------
T.P.I x 36 x 840 x Count x 100
19,000x 60 x 480 x 24 x0.92
Production = -------------------------------------------
19.60 x 36 x 840 x 40 x 100
Where,
Delivery speed = 19000
No. of spindle = 480,
TPI = 19.60,
Count= 40,
Production = 5.09 bags/day/frame
=5.09x52
= 265 bags/52 frames
C. SIMPLEX:
Ring consumption = 265x (100/100-waste)
Ring consumption = 265x (100/100-3)
Ring consumption = 273 bags
H.R =1.20 TM = 0.757 T.P.I = 0.829
Avg. Spindle speed x 60 x No. Of. Spindle x 24 x Eff%
Production = -----------------------------------------------
T.P.I x 36 x 840 x Count.
1100 x60 x120 x 24 x 0.85
Production = --------------------------------------
0.829 x 36 x 840 x 1.20 x 100
Production = 53.70 bags/day/frame
No of simplex frame require = ring consumption/production of one simplex frame
No of simplex require=273/53.70
No of simplex require= 5 simplex
D. Finisher Drawing:
Simplex consumption: 273x (100/100-2)
Simplex consumption: 278.57bags
Speed (mtr/min) x 1.0936 x 60 x 24 x 70 x 0.85(efficiency)
Production = -----------------------------------------------
7000 x 100
400 x 1.0936 x 60 x 24 x 70 x 0.85
Production = ------------------------------------------
7000 x 100
= 54.53bags/day/drawing
No of drawings require = simplex consumption/production of one drawing
No of drawings require=278.57/54.53
No of simplex require= 5
E. Breaker Drawing:
Finisher consumption: 278.57bags
Speed (mtr/min) x 1.0936 x 60 x. 24 x 70 x 0.75(effi)
Production = -----------------------------------------------
7000 x 100
300 x 1.0936 x 60 x 24 x 70 x 0.75
= ------------------------------------------
7000 x 100
= 35.43bags/day per single hand
= 70.68 bags (double delivery)
No of drawings require = finisher consumption/production of one drawing
No of drawings require=278.57/70.68
No of drawings require= 4
Polyester % = 278.57 x 0.52 = 144.85 bags
Cotton % = 278.57 x 0.48 = 133.71 bags
Card :( polyester)
B. Drawframe consumption: 144.85bags
Delivery speed (mtr/min) x 1.0936 x 60 x 24 x 70(grains/yrd) * xn%
Production = -----------------------------------------------
7000 x 100
150 x 1.0936 x 60 x 24 x 67
Production = ------------------------------------ X 0.80
7000 x 100
= 18.89 bags/day/card
No of cards require = B.Drawframe consumption/production of one card
No of cards =144.85/18.89
No of cards = 8